Active delivery · Residential development

59 Addington Road

59 Addington Road, South Croydon CR2 8RD, United Kingdom

Dmitro Facades acted as principal contractor for the demolition and construction of a seven-flat development at 59 Addington Road, with delivery documented from 2021 into 2022.

Service family

Systems & materials

Concrete/steelcavity brick/block wallsPosi-Joistspitched roofcavity barriers
Client
A Team Development Ltd
Developer
A Team Development Ltd
Architect
ARC Architecture & Design
Main contractor
Dmitro Facades Ltd
Delivery entity
Dmitro Development Ltd
Sector
Residential development
System
Concrete/steel, cavity brick/block walls

Project context

Seven-flat residential new build. Residential development

Dmitro scope

Dmitro Facades acted as principal contractor for the demolition and construction of a seven-flat development at 59 Addington Road, with delivery documented from 2021 into 2022.

Systems & materials

Materials and products included Ibstock Bexhill Red, Kingspan K106/K107, Xtratherm, ARC cavity stops, VELFAC 200/200 Energy/In/Ribo and Rationel AURAPLUS RAL 7035/9010 and Gyproc/GTEC. The evidenced assemblies include concrete/steel, cavity brick/block walls, posi-joists, pitched roof, cavity barriers, drylining/fire stopping and velfac openings.

Concrete/steelcavity brick/block wallsPosi-Joistspitched roofcavity barriersdrylining/fire stopping

Delivery & coordination

  • Demolition
  • foundations
  • masonry
  • floors
  • pitched roof
  • partitions

Programme & evidence

CDM plan and over 1,000 procurement rows document sustained principal-contractor delivery

  • Demolition
  • foundations
  • masonry
  • floors

Commercial record

retention
No client contract, certified, final-account or retention value
subcontract/contract value
DOVISTA supplier order £41,897.84 ex VAT
subcontract/contract value
ambiguous £579,873.73 cost-report total not publishable as project value