Drylining & Interior Services

Dmitro was incorporated as a drylining company in 2011, before the envelope work took over the name. The internal package is still delivered the same way — set-out, framing, boards, joints and finish run as one disciplined, bounded build package for main contractors.

600 c/cscrews @ 300 c/cseam on studlaser datum · 0.000bay 4800 × 2400

Frame

C-studs plumbed between floor and head tracks at 600mm centres, noggins where the spec calls.

Board

Boards span two bays so every seam lands on a stud; screw rows follow the stud lines at 300mm centres.

Tape & joint

Seams taped and feathered into the board face; field screws spotted ready for decoration.

Finish

A continuous skim plane lapping the final joint, checked under a raking light.

One bay of partition, elevation 1:20 — the same physical rules the site works to: 600mm centres, seams on studs, screws at 300mm, joints feathered before the skim.

2011

Drylining capability established

Dmitro Development began with drylining delivery as a core trade.

2014

Facade delivery expanded

Envelope packages became the headline work; the internal trades stayed in the delivery repertoire.

2021–22

Interiors inside principal-contractor delivery

At 59 Addington Road the company carried partitions, drylining and fire-stopping within its own whole-building programme.

Package anatomy

The package, stage by stage.

Six stages, in the order the wall is actually built. Each carries its own interface obligation — the part a main contractor's programme depends on.

  1. 01

    Set-out

    Partition lines set out from the structural grid to a laser datum; floor and head tracks fixed and the set-out record returned before framing starts.

    Interface — Set-out sheets issued for approval against the coordinated drawings.

  2. 02

    Metal-stud framing

    C-stud framing erected plumb between tracks at the specified centres, with deflection heads, openings and pattresses framed in — not cut in later.

    Interface — Service penetrations framed from the MEP coordination, deviations recorded.

  3. 03

    Plasterboard systems

    Manufacturer board systems — Gyproc and GTEC sit on the company record — fixed to the specified build-up, seams landing on studs.

    Interface — Closing boards held until first-fix services are signed off zone by zone.

  4. 04

    Tape and jointing

    Joints taped, filled and feathered; field screws spotted — the faster dry finish where the programme calls for it.

    Interface — Joint and fixing schedule kept as part of the QA record.

  5. 05

    Plastering

    Skim and finish coats brought to one true, decoration-ready plane.

    Interface — Surface tolerance checked under a raking light before offer-up.

  6. 06

    Inspection & handover

    Zone-by-zone sign-off with the concealed-work photos, fixings schedule and surface checks issued as the handover record.

    Interface — QA pack handed over per zone, not saved up for practical completion.

Where the project requires it — Suspended ceilings · Fire and acoustic partitions — priced within the package, not offered as a standalone speciality.

Delivery

A build package, not a labour supply.

Interiors run under the same commercial machinery as the envelope works — useful where one accountable specialist should carry both sides of the wall.

Programme
Stage durations priced against the construction programme, with boarding sequenced around first fix so no zone is closed early and none waits open.
Interfaces
Set-out from the structural grid; penetrations, pattresses and service zones framed from the coordinated drawings. Deviations are recorded and reported, not absorbed.
Supervision
A named working supervisor on site, running the same RAMS and inspection discipline the company applies to its envelope packages.
QA & records
Set-out record, pre-boarding photographs of concealed services, fixing and joint schedules, and a final raking-light surface check — issued zone by zone.

On the record

Evidence, worded to its state.

Drylining evidence here is a record set, not a gallery. Each entry is labelled by what the documents actually prove — delivery, archival self-published scope, or documented commercial involvement — and nothing is upgraded past its evidence.

Primary proof · Principal contractor · Own development

59 Addington RoadCR2 8RD

On its own seven-flat development in South Croydon, Dmitro acted as principal contractor for demolition and whole-building construction — and carried the internal partitions, drylining and fire-stopping inside its own programme. This is design-and-build capability evidence, not a subcontract case study.

  • SchemeSeven flats · two storeys plus roof level
  • Internal scopePartitions · drylining · fire-stopping · fit-out stages
  • Board systemsGyproc / GTEC on the procurement record
  • Delivery evidenceCDM plan and 1,000+ procurement rows, 2020–2022
YearProjectInternal scopeEvidence state
2010Queensway House / Nobel House, Redhill126-home redevelopment · record page plannedPartitions within an SFS, cladding and render scope; a site inspection record lists 21 fixers, labourers and plasterers.Dmitro Development project record covering the combined envelope and internal scope.
2015Putney High School Performing Arts CentreDelivery-stage subcontract involvement under ITC Concepts on the performing-arts refurbishment; the exact package is unresolved in the records.Documented commercial involvement (retention invoices, 2015). No scope beyond the cited documents is claimed.
2021–2259 Addington Road, South CroydonSeven-flat new build · own developmentPartitions, drylining and fire-stopping carried within principal-contractor delivery of the whole building; Gyproc / GTEC systems on record.Sustained delivery documented by the CDM plan and over 1,000 procurement rows, 2020–2022.

Capability lanes

Three trades, one package.

Dedicated service pages follow when each lane has its own reviewed proof — until then, enquire through the package route.

Drylining

Wall linings and internal build-ups to the specified system, fixed and finished to programme.

Metal-stud partitions

Partition layouts set out from the structural grid, framed, boarded and closed as one trade package.

Plastering & tape-and-jointing

Skim finishes and taped joints brought to a decoration-ready standard, checked under raking light.