# Honilands Primary School. School-expansion cladding package. Enfield, London EN1.

> A five-week cladding package in the expansion of Honilands Primary School, Lovell Road, Enfield, completed 2013.
> HTML version: https://dmitrodevelopment.co.uk/projects/honilands-primary-school-enfield/

The team behind Dmitro Development delivered a five-week cladding package for main contractor Murphy on the 2013 expansion of Honilands Primary School.

![Honilands Primary School's expansion, curved dark roofs over yellow, green and blue glazed gable walls between brick piers](https://dmitrodevelopment.co.uk/assets/projects/honilands-primary-school-enfield/honilands-primary-school-enfield-expansion-curved-dark-roofs-yellow-green-fallback.jpg)

The expansion from the playground: three curved roofs over yellow, green and blue glazed gable walls, set between brick piers.

The completed expansion of Honilands Primary School on Lovell Road, Enfield, photographed from the playground. Three staggered two-storey volumes each sit under a curved, overhanging roof, their glazed gable ends banded in yellow, green and blue between brick piers. Shepheard Epstein Hunter, now SEH, designed the extension for the London Borough of Enfield. The team behind Dmitro Development delivered a five-week cladding package on the project for main contractor Murphy.

## A five-week cladding package.

- **Package**: Cladding
- **Main contractor**: Murphy
- **End client**: London Borough of Enfield
- **Architect**: SEH (Shepheard Epstein Hunter)
- **Completed**: 2013

Enfield Council expanded Honilands from a two-form entry school with a nursery to a three-form entry school with a Children's Centre, one more class in every year group. The new teaching accommodation sits behind the school's existing two-storey wing on Lovell Road.

[Part of: cladding and facade packages](https://dmitrodevelopment.co.uk/facade-cladding/)

## An extension drawn from the school's own roofline.

SEH took the existing school's vaulted roof profile and staggered footprint as the basis for the extension.

The brickwork, glazing, roofing and landscaping belong to the wider project; our package was the cladding.

![A brick block under a curved overhanging roof, with dark-framed glazing and yellow, green and blue panels and glazed doors](https://dmitrodevelopment.co.uk/assets/projects/honilands-primary-school-enfield/honilands-primary-school-enfield-brick-block-curved-overhanging-roof-dark-fallback.jpg)

A brick block under a curved, overhanging roof, its glazed front banded in yellow, green and blue, with glazed doors to the right.

A block under a curved, overhanging roof with a pale soffit and a dark edge. Its front is dark-framed glazing with yellow, green and blue infill panels, set between red brick walls, with glazed double doors to the right under the roof. The team behind Dmitro Development delivered a cladding package on the Honilands expansion; the brickwork, glazing and roofing belong to the wider project.

## More room, on the same school site.

The expansion came through two planning consents: a detached nursery building, approved in July 2010, and the main two-storey extension with a new front entrance lobby, taken to Enfield's planning committee in February 2011.

Lovell Road, Enfield EN1 4RE

[Part of: cladding and facade packages](https://dmitrodevelopment.co.uk/facade-cladding/)

## Related projects

- [Newlands Road. Viroc and timber rainscreen. Woodford Green.](https://dmitrodevelopment.co.uk/projects/newlands-road-woodford-green/)
  ![Red Viroc rainscreen panels meeting black charred-timber cladding on the gable of the remodelled house at Newlands Road, Woodford Green](https://dmitrodevelopment.co.uk/assets/projects/newlands-road-woodford-green/newlands-road-woodford-green-red-viroc-rainscreen-panels-meeting-black-fallback.jpg)
  Markdown: https://dmitrodevelopment.co.uk/projects/newlands-road-woodford-green.md
- [4 Cam Road. Cladding package. Stratford.](https://dmitrodevelopment.co.uk/projects/4-cam-road-stratford/)
  ![Timber-faced cladding, dark-framed windows and white cantilevered balconies above a dark brick base at 4 Cam Road, Stratford](https://dmitrodevelopment.co.uk/assets/projects/4-cam-road-stratford/4-cam-road-stratford-building-refurbishment-london-fallback.jpg)
  Markdown: https://dmitrodevelopment.co.uk/projects/4-cam-road-stratford.md
- [Plumcroft Primary School. SFS and cladding. Woolwich.](https://dmitrodevelopment.co.uk/projects/plumcroft-primary-school-woolwich/)
  ![Vincent Road Campus with its grey standing-seam zinc hall block and purple horizontal cladding above a brick base, Plumcroft Primary School, Woolwich](https://dmitrodevelopment.co.uk/assets/projects/plumcroft-primary-school-woolwich/plumcroft-primary-school-woolwich-vincent-road-campus-grey-standing-seam-fallback.jpg)
  Markdown: https://dmitrodevelopment.co.uk/projects/plumcroft-primary-school-woolwich.md