# Everly House. Facade-interface and balcony design. Colindale, London NW9.

> Facade-interface design, balcony detailing and SFS setting-out for Shepherd Construction at Everly House, the 17-storey Colindale tower.
> HTML version: https://dmitrodevelopment.co.uk/projects/everly-house-colindale/

The team behind Dmitro Development delivered balcony and facade-interface design for main contractor Shepherd Construction Ltd at Everly House, the 17-storey frontage tower of The Northern Quarter in Colindale.

![A corner balcony near the top of Everly House, its glazed balustrade and soffit framing a view north over Colindale and the London suburbs beyond](https://dmitrodevelopment.co.uk/assets/projects/everly-house-colindale/everly-house-colindale-corner-balcony-near-top-glazed-balustrade-fallback.jpg)

01 · A corner balcony near the top of the tower, framing the view north over Colindale.

Residential tower

A corner balcony on the upper floors of Everly House, the 17-storey Block E tower of The Northern Quarter, Colindale. Its glazed balustrade and aluminium soffit frame a view north across Colindale and the London suburbs beyond. The team behind Dmitro Development delivered balcony detailing and facade-interface design for main contractor Shepherd Construction Ltd on this scheme.

## At a glance

- **Package**: Balcony & facade works
- **Main contractor**: Shepherd Construction Ltd
- **Location**: Colindale · London NW9
- **Wider scheme**: The Northern Quarter, Block E
- **Homes at Everly House**: 81 flats

The team behind Dmitro Development delivered facade-interface design, balcony detailing and SFS setting-out design for main contractor Shepherd Construction Ltd at Everly House, the 17-storey Block E tower and final residential phase of The Northern Quarter in Colindale, developed by NEAT Developments in joint venture with Royal London Asset Management.

[Part of: Facade packages](https://dmitrodevelopment.co.uk/facade-cladding/)

## 02 · The frontage tower of a 460-home regeneration.

Everly House rises 17 storeys above The Northern Quarter's landscaped podium in Colindale, the final residential phase of a scheme built for Royal London Asset Management and NEAT Developments.

![Everly House at dusk, its stone-toned tower rising above the lit retail podium of The Northern Quarter, Colindale](https://dmitrodevelopment.co.uk/assets/projects/everly-house-colindale/everly-house-colindale-dusk-stone-toned-tower-rising-lit-fallback.jpg)

Everly House at dusk, its stone-toned facade and glazed balconies lit above the retail podium of The Northern Quarter, Colindale. The tower is Block E of the wider mixed-use scheme, developed by NEAT Developments in joint venture with Royal London Asset Management on Edgware Road.

## Within The Northern Quarter

Everly House is the frontage tower of a five-building regeneration on Edgware Road. These two views, taken from the green space beside it and from street level, show the wider scheme's completed setting, not the team's own balcony and facade package.

![Everly House tower nearing completion, seen across a green space in Colindale with protective wrap still on its lower floors](https://dmitrodevelopment.co.uk/assets/projects/everly-house-colindale/everly-house-colindale-tower-nearing-completion-green-space-protective-fallback.jpg)

03 · Everly House nearing completion, seen from the green beside Colindale's Edgware Road.

Everly House nearing completion, seen from the green space beside Edgware Road in Colindale. Protective wrap still covers the lower floors while the upper elevations stand finished in daylight.

![Everly House's completed street-level frontage in Colindale, with ground-floor retail glazing and traffic passing on Edgware Road](https://dmitrodevelopment.co.uk/assets/projects/everly-house-colindale/everly-house-colindale-completed-street-level-frontage-ground-floor-fallback.jpg)

04 · The completed frontage at street level, its ground-floor glazing open to Edgware Road.

Everly House's completed frontage at street level in Colindale, its ground-floor retail glazing open to Edgware Road. Scaffolding remains on a neighbouring block as the wider Northern Quarter scheme continues around it.

## 05 · The tower's entrance lobby, part of the wider scheme's completed interior.

![The entrance lobby at Everly House, with a curved reception desk, lift lobby and mailboxes beneath a double-height ceiling](https://dmitrodevelopment.co.uk/assets/projects/everly-house-colindale/everly-house-colindale-entrance-lobby-curved-reception-desk-lift-fallback.jpg)

The entrance lobby at Everly House, its reception desk, lift lobby and mailboxes shown as context for the completed scheme. The interior fit-out is not part of the team's balcony and facade package.

The wider scheme

## Block E of a five-building regeneration on Edgware Road.

Everly House is the 17-storey Block E tower of The Northern Quarter, the final residential phase of a mixed-use regeneration that replaced a former retail-warehouse site with 460 homes, close to 90,000 sq ft of retail and leisure space and four landscaped courtyards raised around 40 ft above street level. The scheme was developed by NEAT Developments in joint venture with Royal London Asset Management, designed by DunnettCraven (now DC+Partners), and delivered by main contractor Shepherd Construction Ltd on a design-and-build basis for the London Borough of Brent. Everly House itself contains 81 flats.

The team behind Dmitro Development worked directly for Shepherd Construction on TNQ Colindale Block E, under project reference 18068 and drawing series DF-8068. Its documented role was facade-interface design, balcony detailing and SFS setting-out design, together with delivery-stage quality records. The scheme's own responsibility drawings record the door frames, EPDM, SFS installation, sealants, breather membrane, calcium-silicate board and ceramic-granite cladding itself as works by others.

Block E's facade build-up was later amended by planning application 18/2039, approved in June 2018: a 150mm adjustment to the elevation, with revised tile and brass-panel setting-out and changes to window positions and alignments.

- Drawing issue register: 18 January 2019
- Cladding drawings: DF-8068-101 to 161, 180 to 187
- SFS design issue: P1 15 May 2019 · P2 10 June 2019
- QA photographs: 83, elevations A-C, August 2020

## 06 · A corner balcony on a lower floor, its glazing and balustrade repeated up the tower.

![A corner balcony at Everly House with glazed balustrade and aluminium soffit, overlooking Colindale rooftops](https://dmitrodevelopment.co.uk/assets/projects/everly-house-colindale/everly-house-colindale-corner-balcony-glazed-balustrade-aluminium-soffit-fallback.jpg)

A corner balcony on a lower floor of Everly House, its glazed balustrade and aluminium soffit repeating the same detail seen on the upper floors. The balcony overlooks Colindale's rooftops towards the wider London skyline.

## 07 · A furnished balcony looking out towards a neighbouring plot still under construction.

![A furnished balcony at Everly House looking out towards a neighbouring building under construction, wrapped in blue netting](https://dmitrodevelopment.co.uk/assets/projects/everly-house-colindale/everly-house-colindale-furnished-balcony-neighbouring-building-construction-wrapped-fallback.jpg)

A furnished balcony at Everly House, its bistro table and chair set against a view of a neighbouring plot still wrapped in construction netting, part of the wider Northern Quarter scheme's ongoing phases.

## Designed and set out for construction

- Sixteen numbered balcony setting-out types
- SFS design at 600mm stud and track centres
- Facade-interface detailing around Rockwool insulation and Siderise cavity barriers
- Bracket, L-rail and flashing detail
- QA photography across elevations A, B and C

![Everly House with scaffold wrap on its lower floors as the facade works near completion, a red bus passing at street level](https://dmitrodevelopment.co.uk/assets/projects/everly-house-colindale/everly-house-colindale-scaffold-wrap-lower-floors-facade-works-fallback.jpg)

08 · Scaffold wrap comes down as each elevation is finished.

Everly House under the final stages of its facade works, scaffold wrap still covering part of the tower above street level as the upper elevations stand finished. The team behind Dmitro Development detailed the balcony and SFS interfaces across these elevations for main contractor Shepherd Construction Ltd.

## Everly House, its balcony and facade interfaces designed by the team.

Colindale, London NW9

- **Architect**: DunnettCraven, now DC+Partners
- **Developer**: NEAT Developments, with Royal London Asset Management
- **Planning authority**: London Borough of Brent
- **Everly House handover**: Q1 2021

## Related projects

- [Randall's. SureClad ceramic-granite installation. Uxbridge.](https://dmitrodevelopment.co.uk/projects/randalls-uxbridge/)
  ![Design visualisation of Charleston House's ceramic granite-clad corner elevation, adjoining the retained Art Deco Randall's frontage on Vine Street, Uxbridge](https://dmitrodevelopment.co.uk/assets/projects/randalls-uxbridge/randalls-uxbridge-design-visualisation-charleston-house-ceramic-granite-fallback.jpg)
  Markdown: https://dmitrodevelopment.co.uk/projects/randalls-uxbridge.md
- [Rye Hill. Render, soffits and fire barriers. Peckham.](https://dmitrodevelopment.co.uk/projects/rye-hill-peckham/)
  ![Rye Hill Park's new homes on Rye Hill Park, Peckham Rye, seen from the street with the site's retained mature tree in the foreground](https://dmitrodevelopment.co.uk/assets/projects/rye-hill-peckham/rye-hill-peckham-park-new-homes-street-site-retained-fallback.jpg)
  Markdown: https://dmitrodevelopment.co.uk/projects/rye-hill-peckham.md
- [Canada Water Library. Cladding package. Rotherhithe.](https://dmitrodevelopment.co.uk/projects/canada-water-library/)
  ![Close view of the anodised-mesh cladding at the corner of Canada Water Library, above angled first-floor windows](https://dmitrodevelopment.co.uk/assets/projects/canada-water-library/canada-water-library-cladding-corner-detail-fallback.jpg)
  Markdown: https://dmitrodevelopment.co.uk/projects/canada-water-library.md