# About Dmitro Development

> Cladding & drylining subcontractor with 20+ years on facades for Hollybrook, Morgan Sindall & Vistry. CHAS & Constructionline accredited, London & South East.
> HTML version: https://dmitrodevelopment.co.uk/about/

Dmitro Development is a cladding and facade contractor to main contractors and developers. Our own installers have clad offices, homes, schools and data centres across London, the South East and the Channel Islands.

![Axtell House's three rebuilt upper storeys in fluted cream engineered stone, above the carved Art Deco stone corner in Soho](https://dmitrodevelopment.co.uk/assets/projects/axtell-house-soho/axtell-house-soho-fluted-engineered-stone-cladding-glass-balustrades-fallback.jpg)

![Close-up of cream engineered stone panels with vertical fluting, meeting at a horizontal joint in low sunlight](https://dmitrodevelopment.co.uk/assets/projects/axtell-house-soho/axtell-house-soho-cream-engineered-stone-panels-vertical-fluting-fallback.jpg)
Axtell House, Soho. Fluted engineered stone, lined through at every joint.

- **20+ years**: Facade experience leading the company
- **43**: Published projects
- **12**: Team, design and engineering included
- **1 working day**: To reply to every enquiry
- **CHAS**: and Constructionline accredited

## Cladding installed to tight tolerances.

A facade gets judged from arm’s length. Lines that run true across the whole elevation. Joints that stay even from the first panel to the last. Returns and reveals that close without a patch. That is the standard our installers hold on every package, large-format panels included.

### Set out before the first bracket.

Every elevation is set out and checked from datum before a rail goes on, so the lines run true across the whole face.

### Every joint, every return.

Corners, reveals and soffits are detailed and cut by the people fixing them, so the finish holds all the way to the edges.

### Checked before it is covered.

Brackets, fixings and fire barriers are inspected and photographed at hold points before the next layer hides them.

![Close view up the face of gold aluminium rainscreen panels, their vertical joints running dead straight to the roofline](https://dmitrodevelopment.co.uk/assets/projects/william-gaitskell-house-paradise-street/william-gaitskell-house-paradise-street-upward-gold-aluminium-panels-rows-rivets-fallback.jpg)
Gold aluminium rainscreen we designed, fabricated and installed. [William Gaitskell House, Rotherhithe](https://dmitrodevelopment.co.uk/projects/william-gaitskell-house-paradise-street/)

![Large pale speckled granite panels set out around dark louvre openings beneath a projecting soffit](https://dmitrodevelopment.co.uk/assets/projects/the-point-isle-of-dogs/the-point-isle-of-dogs-large-pale-speckled-granite-panels-dark-fallback.jpg)
Natural granite rainscreen set out around the louvres. [The Point, Isle of Dogs](https://dmitrodevelopment.co.uk/projects/the-point-isle-of-dogs/)

![Roof-level chimney form clad in folded perforated metal panels beside flat dark cladding and a glazed storey](https://dmitrodevelopment.co.uk/assets/projects/8-bleeding-heart-yard-greville-street/8-bleeding-heart-yard-greville-street-roof-level-chimney-form-clad-perforated-fallback.jpg)
Photo: Tim Soar
Folded perforated aluminium, right up to the chimney. [8 Bleeding Heart Yard, Farringdon](https://dmitrodevelopment.co.uk/projects/8-bleeding-heart-yard-greville-street/)

![Fluted cream engineered stone bays turning a corner of Axtell House, with the glass balustrade above against blue sky](https://dmitrodevelopment.co.uk/assets/projects/axtell-house-soho/axtell-house-soho-fluted-cream-engineered-stone-bays-turning-fallback.jpg)
Fluted stone bays turning the corner, flutes aligned course to course. [Axtell House, Soho](https://dmitrodevelopment.co.uk/projects/axtell-house-soho/)

## Our own installers on every package.

We do not broker facades. The people who price the package are the people who fix it: our own installers, led by a supervisor who stays with the job from the first bracket to handover.

On the largest packages, like Acton Works in Park Royal, we bring in extra crews and run them under our own supervision and our own standards.

A 12-strong team, with the design and engineering support to coordinate the package with the architect, the main contractor and the manufacturer.

We have been the client too. Our experience is as a subcontractor, developer and builder: facade packages for Tier 1 and regional main contractors, and homes we developed and built ourselves, like 50 Woodside in Wimbledon. We price and sequence a facade the way a client needs it.

![Mineral-wool insulation on an elevation at Acton Works, with rails fixed through it and the scaffold alongside](https://dmitrodevelopment.co.uk/assets/projects/acton-works-park-royal/acton-works-park-royal-elevation-works-in-progress-fallback.jpg)
Mineral-wool insulation, rails fixed through it. Acton Works, Park Royal.

[Acton Works, the full package](https://dmitrodevelopment.co.uk/projects/acton-works-park-royal/)

## London facade projects, and the contractors who bring us back.

Hollybrook have brought us back for nine published projects. RED Construction, Morgan Sindall, Metnor and Frencon for two each. Six of them, west to east and back.

### [Acton Works](https://dmitrodevelopment.co.uk/projects/acton-works-park-royal/)

Park Royal. SFS framing, Siniat sheathing, Rockwool fire barriers and the full cladding build-up, on one of the biggest crews we have run.

![Completed principal exterior at Acton Works](https://dmitrodevelopment.co.uk/assets/projects/acton-works-park-royal/acton-works-park-royal-completed-principal-exterior-fallback.jpg)
Photo: Hollybrook

### [Axtell House](https://dmitrodevelopment.co.uk/projects/axtell-house-soho/)

Soho. Shackerley SureClad engineered stone and 80 m of frameless glass balustrade on three new storeys above an Art Deco corner, for RED Construction.

![005 005 office transformation delivers new twist on traditional stone facade axtell house1](https://dmitrodevelopment.co.uk/assets/projects/axtell-house-soho/axtell-house-soho-fluted-engineered-stone-cladding-glass-balustrades-fallback.jpg)

### [8 Bleeding Heart Yard](https://dmitrodevelopment.co.uk/projects/8-bleeding-heart-yard-greville-street/)

Farringdon. A folded perforated aluminium screen, PPC cladding and windows on a refurbished 1970s block, for RED Construction.

![Greville St 0116 3580431e48aedf97dcedf972d1481942](https://dmitrodevelopment.co.uk/assets/projects/8-bleeding-heart-yard-greville-street/8-bleeding-heart-yard-greville-street-corner-wrapped-rust-brown-folded-aluminium-fallback.jpg)

### [William Gaitskell House](https://dmitrodevelopment.co.uk/projects/william-gaitskell-house-paradise-street/)

Rotherhithe. Gold aluminium rainscreen we designed, fabricated and installed, on new houses beside a listed 1814 police station, for Hollybrook.

![006 06 0017](https://dmitrodevelopment.co.uk/assets/projects/william-gaitskell-house-paradise-street/william-gaitskell-house-paradise-street-gold-aluminium-rainscreen-fins-reveals-soffit-fallback.jpg)

### [The Point](https://dmitrodevelopment.co.uk/projects/the-point-isle-of-dogs/)

Isle of Dogs. Shackerley SureClad granite rainscreen and granite-faced louvres on a data centre by the dock, for Metnor Construction.

![The Point, image 14](https://dmitrodevelopment.co.uk/assets/projects/the-point-isle-of-dogs/the-point-isle-of-dogs-glazed-pale-panelled-dockside-buildings-fallback.jpg)

### [50 Woodside](https://dmitrodevelopment.co.uk/projects/50-woodside-wimbledon/)

Wimbledon. Our own development. A four-storey, five-bedroom house in standing-seam zinc and yellow stock brick over an underpinned basement, developed and built by us.

![savills index 08](https://dmitrodevelopment.co.uk/assets/projects/50-woodside-wimbledon/50-woodside-wimbledon-front-new-house-dark-standing-seam-fallback.jpg)
Photo: Savills

[All the projects](https://dmitrodevelopment.co.uk/projects/)

## Cladding in Guernsey.

We take the whole facade package to the island. In Guernsey we installed Shackerley’s stone rainscreen system: large-format engineered stone and porcelain panels on an engineered subgrid, with the insulation, cavity and fire barriers, EPDM and soffits behind them, lined through to tight tolerances.

Crews and materials were shipped to the island, and every week we reported who was on site and what went in. We work in Guernsey and Jersey, as the facade subcontractor to the main contractor, exactly as we do on the mainland.

[Cladding in Guernsey and the Channel Islands](https://dmitrodevelopment.co.uk/facade-cladding/cladding-guernsey/)

## Main contractors we deliver for.

- **Hollybrook**: [Queensway House](https://dmitrodevelopment.co.uk/projects/queensway-house-redhill/), [The Refinery](https://dmitrodevelopment.co.uk/projects/the-refinery-silvertown/), [Carnarvon Road](https://dmitrodevelopment.co.uk/projects/carnarvon-road-southend/), [4 Cam Road](https://dmitrodevelopment.co.uk/projects/4-cam-road-stratford/), [Imperial Court](https://dmitrodevelopment.co.uk/projects/imperial-court-odessa-street/), [William Gaitskell House](https://dmitrodevelopment.co.uk/projects/william-gaitskell-house-paradise-street/), [19 Queen Elizabeth Street](https://dmitrodevelopment.co.uk/projects/19-queen-elizabeth-street-bermondsey/), [Suttons Wharf North](https://dmitrodevelopment.co.uk/projects/suttons-wharf-north-bethnal-green/), [Newlands Road](https://dmitrodevelopment.co.uk/projects/newlands-road-woodford-green/)
- **RED Construction**: [Axtell House](https://dmitrodevelopment.co.uk/projects/axtell-house-soho/), [8 Bleeding Heart Yard](https://dmitrodevelopment.co.uk/projects/8-bleeding-heart-yard-greville-street/)
- **Morgan Sindall**: [South Essex College](https://dmitrodevelopment.co.uk/projects/south-essex-college-basildon/), [Cranleigh Health Centre](https://dmitrodevelopment.co.uk/projects/cranleigh-health-centre/)
- **Vistry Partnerships**: [Plaistow Hub](https://dmitrodevelopment.co.uk/projects/plaistow-hub-vitradual-facade/)
- **Telford Homes**: [Unity Place](https://dmitrodevelopment.co.uk/projects/unity-place-south-kilburn/)
- **John Sisk & Son**: [Ashfield House](https://dmitrodevelopment.co.uk/projects/ashfield-house-ashby-de-la-zouch/)
- **Galliard Construction**: [Trilogy](https://dmitrodevelopment.co.uk/projects/trilogy-harper-road/)
- **Shepherd Construction**: [Everly House](https://dmitrodevelopment.co.uk/projects/everly-house-colindale/)
- **Metnor Construction**: [The Point](https://dmitrodevelopment.co.uk/projects/the-point-isle-of-dogs/), [Liberham Lodge](https://dmitrodevelopment.co.uk/projects/liberham-lodge-little-bookham/)
- **Frencon**: [Mount Ephraim House](https://dmitrodevelopment.co.uk/projects/mount-ephraim-house-tunbridge-wells/), [Plumcroft Primary School](https://dmitrodevelopment.co.uk/projects/plumcroft-primary-school-woolwich/)
- **Equans**: [Rye Hill](https://dmitrodevelopment.co.uk/projects/rye-hill-peckham/)
- **Regal London**: [The Cube](https://dmitrodevelopment.co.uk/projects/the-cube-wenlock-road-remediation/)
- **Henry Construction**: [RACS, Tooting](https://dmitrodevelopment.co.uk/projects/racs-upper-tooting-road/)

Also Hyper Construction, Kind & Company, Sage Housing, MKS Build, Procare, T&B Contractors, Richardsons, ITC Concepts and Specialist Structures.

### Named as installer by the industry.

- [Shackerley](https://www.shackerley.com/news/shackerley-sureclad-complements-art-deco-design-at-charleston-house): SureClad ceramic granite at Charleston House, Uxbridge
- [RIBA Journal](https://www.ribaj.com/spec/8-bleeding-heart-yard-london-amin-taha-groupwork-office-renovation/): The folded mesh facade at 8 Bleeding Heart Yard
- [Balconette](https://www.balconette.co.uk/glass-balustrade/case-studies/frameless-glass-balustrades-in-axtell-house): Frameless glass balustrades at Axtell House
- [The Construction Index](https://www.theconstructionindex.co.uk/news/view/old-meets-new): The engineered stone storeys of Axtell House
- [Architects’ Datafile](https://www.architectsdatafile.co.uk/news/the-thames-and-transformation/): ALUCOBOND tray panels at New Pier Wharf, Rotherhithe

## Cladding systems and materials we install.

Approved installers for Shackerley and Metsec.

### Stone and ceramic

- Shackerley SureClad engineered stone: [Axtell House](https://dmitrodevelopment.co.uk/projects/axtell-house-soho/)
- Shackerley SureClad granite: [The Point](https://dmitrodevelopment.co.uk/projects/the-point-isle-of-dogs/)
- Shackerley SureClad ceramic granite: [Randall’s](https://dmitrodevelopment.co.uk/projects/randalls-uxbridge/)
- Petrarch stone-effect cladding: [RACS](https://dmitrodevelopment.co.uk/projects/racs-upper-tooting-road/)

### Metal

- ALUCOBOND copper-tone rainscreen: [Imperial Court](https://dmitrodevelopment.co.uk/projects/imperial-court-odessa-street/)
- VitraDual rainscreen: [Plaistow Hub](https://dmitrodevelopment.co.uk/projects/plaistow-hub-vitradual-facade/)
- VitraBond natural zinc: [Ability Plaza](https://dmitrodevelopment.co.uk/projects/ability-plaza-haggerston/)
- Kalzip standing seam: [Imperial Court](https://dmitrodevelopment.co.uk/projects/imperial-court-odessa-street/)
- Folded perforated aluminium: [8 Bleeding Heart Yard](https://dmitrodevelopment.co.uk/projects/8-bleeding-heart-yard-greville-street/)
- Bronze-anodised aluminium cassettes: [Unity Place](https://dmitrodevelopment.co.uk/projects/unity-place-south-kilburn/)

### Fibre cement, HPL and timber

- Equitone Tectiva: [Ciceley Court](https://dmitrodevelopment.co.uk/projects/ciceley-court-croydon/)
- Eternit Pictura: [Vodafone, Swindon](https://dmitrodevelopment.co.uk/projects/vodafone-swindon-data-centre-cladding/)
- Trespa Meteon: [Suttons Wharf North](https://dmitrodevelopment.co.uk/projects/suttons-wharf-north-bethnal-green/)
- Parklex Prodema: [GSK, Stevenage](https://dmitrodevelopment.co.uk/projects/gsk-security-lodge-stevenage/)
- Viroc and charred Thermopine: [Newlands Road](https://dmitrodevelopment.co.uk/projects/newlands-road-woodford-green/)
- Siberian larch: [Blue Lion Place](https://dmitrodevelopment.co.uk/projects/blue-lion-place-southwark/)

### Render and brick slip

- Sto insulated render: [The Cube](https://dmitrodevelopment.co.uk/projects/the-cube-wenlock-road-remediation/)
- Sto Rotofix Plus brick slip: [The Panorama](https://dmitrodevelopment.co.uk/projects/panorama-phase-2-ashford/)

### SFS and the build-up

- Metsec SFS: [Plumcroft](https://dmitrodevelopment.co.uk/projects/plumcroft-primary-school-woolwich/)
- Kingspan SFS: [Imperial Court](https://dmitrodevelopment.co.uk/projects/imperial-court-odessa-street/)
- Siniat sheathing: [Acton Works](https://dmitrodevelopment.co.uk/projects/acton-works-park-royal/)
- Rockwool insulation and fire barriers: [Plaistow Hub](https://dmitrodevelopment.co.uk/projects/plaistow-hub-vitradual-facade/)
- Kingspan Kooltherm: [Bishopsgate House](https://dmitrodevelopment.co.uk/projects/bishopsgate-house-hounslow/)

### Windows and doors

- VELFAC windows and doors: [Trilogy](https://dmitrodevelopment.co.uk/projects/trilogy-harper-road/)
- Reynaers windows and folding doors: [Newlands Road](https://dmitrodevelopment.co.uk/projects/newlands-road-woodford-green/)

[Cladding and facade services](https://dmitrodevelopment.co.uk/facade-cladding/)

## Cladding, drylining and remediation.

- [Cladding & Facade](https://dmitrodevelopment.co.uk/facade-cladding/): Dmitro coordinates, supplies and installs cladding, rainscreen, SFS and glazing interfaces as one external-envelope package.
- [Drylining & Interiors](https://dmitrodevelopment.co.uk/drylining-interiors/): Metal stud partitions, plasterboard, plastering, tape and jointing, planned and delivered alongside the envelope works.
- [Recladding & Remediation](https://dmitrodevelopment.co.uk/recladding-remediation/): Investigation, replacement and rebuilding of existing cladding, with fire and cavity-barrier coordination and recorded QA.

## Health and safety, RAMS and compliance.

Facade work is work at height, with cranes, on live sites. The discipline below is how every Dmitro package is planned, supervised and recorded, on our own developments and under main-contractor site rules alike.

Every package runs on project-specific RAMS, produced in [ComplyOnSite](https://complyonsite.com/) [RAMS software](https://complyonsite.com/rams) and reviewed before an operative starts.

- **CHAS and Constructionline.** Accredited, with PQQ and tender documents issued on request.
- **Public liability and professional indemnity.** Both held, certificates supplied for prequalification.
- **A named supervisor.** On every package, from daily briefings to the interface with the main contractor.
- **Post-Grenfell retesting.** We have taken part in retesting installed cladding systems in Northern Ireland.

- [CHAS](https://www.chas.co.uk/): Health and safety assessment accreditation, supporting prequalification with main contractors and clients.
- [Constructionline](https://www.constructionline.co.uk/): Registered on the Constructionline procurement and supply-chain platform used by UK main contractors and public-sector buyers.

### Accreditations and compliance

These credentials are current and verifiable.

Certificates and registration details are available on request for prequalification and tender review.

- **Prequalification readiness.** PQQ and tender documentation (insurances, policies and project references) maintained and issued on request.
- **RAMS.** Project-specific risk assessments and method statements produced for every package before works start.
- **QA records.** Inspection and hold-point records kept through the works and compiled into the handover file.
- **Main-contractor systems.** Site teams work inside tier-1 and regional main-contractor management systems, inductions, permits and reporting included.

### How we run a safe site

- **RAMS before boots.** Project-specific risk assessments and method statements are produced and reviewed before any operative starts. Access, lifting, fire and weather-tightness risks are dealt with on paper first.
- **Competent supervision.** Every package runs under a named site supervisor responsible for daily briefings, permit compliance and the interface with the main contractor’s management team.
- **Main-contractor site rules.** Dmitro teams work inside tier-1 and regional main-contractor systems. Inductions, permits to work, inspection regimes and reporting are followed, not duplicated.
- **Installation sequencing.** Facade and interior works are sequenced so elevations close out safely: scaffold and access logic, exclusion zones and material logistics planned with the site team.
- **QA and hold points.** Barriers, fixings and concealed layers are inspected and photographed at agreed hold points before they are covered, with records kept through the works.
- **Handover records.** Inspection and test documentation is compiled into the handover file so the client’s team can evidence what was built.

## Sustainable cladding, built to last.

The building envelope decides how a building performs for decades. That is where a facade contractor’s contribution is real: long-life materials, one continuous insulation and airtightness line, and less waste on site.

- **Materials chosen to last.** Cladding selections are weighed for service life as well as appearance: long-life facade materials and detailing that protects the layers behind them.
- **Performance of the envelope.** Insulation, membranes and airtightness lines installed as one continuous system. That is the part of building performance a facade contractor actually controls.
- **Waste-aware site delivery.** Packages planned to cut waste at source: measured procurement, panel optimisation and segregated waste streams within the main contractor’s site arrangements.
- **Refurbishment and retrofit.** The project record includes refurbishment and retrofit work on existing buildings, reusing structure and fabric rather than replacing it.
- **Responsible sourcing.** Materials are procured from established UK and European manufacturers with published environmental documentation.

## Questions main contractors ask.

### Do you supply and install, or install only?

Both. We coordinate, supply and install the cladding, rainscreen, SFS and glazing interfaces as one package, or install a specified system supplied by others.

### Is it your own labour?

Yes. Our own installers fix every package, under our own supervisor. On the largest jobs we add crews and run them to the same standard.

### Which systems are you approved to install?

We are approved installers for Shackerley and Metsec, and we have installed Alucobond, VitraDual, Equitone, Trespa, Parklex, Sto, Kalzip and Rockwool systems on published projects.

### Where do you work?

Across London and the South East, and in Guernsey and Jersey. We have also delivered specialist projects further afield, in Swindon and Ashby-de-la-Zouch.

### What insurance do you hold?

Public liability and professional indemnity insurance. Certificates are supplied for prequalification.

### Can you prequalify on our supply chain?

Yes. We are CHAS and Constructionline accredited, and our PQQ, RAMS and QA documents are ready for tender review.

### How quickly do you reply?

Within one working day, to every enquiry.

## The company.

Based in London and the South East, with projects across the UK and the Channel Islands, including Jersey and Guernsey. We have also delivered selected specialist projects outside these areas.

Dmitro Development, Quadrant House, 13-15 High Street, St. Mary Cray, Orpington BR5 3NL
Phone: 01689 810 470
Email: info@dmitrodev.co.uk
[Download company portfolio](https://dmitrodevelopment.co.uk/downloads/dmitro-development-portfolio-2026.pdf)
[LinkedIn](https://www.linkedin.com/company/dmitro-development/) · [Facebook](https://www.facebook.com/dmitro.development/) · [Instagram](https://www.instagram.com/dmitrodevelopmentuk) · [Pinterest](https://www.pinterest.com/dmitrodevelopment/) · [YouTube](https://www.youtube.com/@DmitroDevelopment)

## Send the package.

Send drawings, scope, location, access notes and programme dates. We reply within one working day with the next step.

[Send us a package](https://dmitrodevelopment.co.uk/contact/)
